Chevron Energy Solutions, a unit of Chevron Corporation, and the Marine Corps Logistics Base (MCLB) Albany announced on May 20, 2010 the start of construction for the Department of Navy's first landfill gas cogeneration project.
The project will produce 1.9 megawatts of renewable electric power and steam by burning landfill gas collected from a nearby landfill. Chevron Energy Solutions will also complete industrial lighting retrofits in 82 buildings and expand the existing energy management control system. When combined with the cogeneration project, these measures will reduce the base's purchase of utility power and reduce MCLB's carbon emissions by 19,300 tons annually, equivalent to removing 16,000 cars from the road.
Chevron Energy Solutions developed and designed the project and will maintain the landfill gas-to-energy facility, pipeline and landfill gas processing equipment. The new facility will house a dual-fuel engine generator, a stack heat recovery steam generator and two dual-fuel boilers. The primary equipment can operate on landfill gas or natural gas, which provides energy security benefits. MCLB's use of renewable power will increase to 19 percent, which exceeds the EPAct of 2005 and Energy Independence and Security Act of 2007 mandate of 7.5 percent renewable power use by 2013.
Dougherty County will extract and sell the landfill gas to MCLB from the Fleming/Gaissert Road Landfill, which receives approximately 100,000 tons of municipal solid waste each year. The biological decomposition of the waste generates landfill gas that is approximately 50 percent methane gas by volume.
The project is expected to be completed by April 2011.
No comments:
Post a Comment